Regional construction waste collectors

Construction site waste collection: plan routes and choose disposal sites in a few clicks

OCTAVE-ENGINE empties your construction sites and collection points, then picks the most relevant disposal sites, with your fleet, your materials and your opening hours.

Your constraints are already in the calculation

The engine starts from how a collection branch really works, not from an ideal route.

  • A mixed fleet

    In-house trucks of several types and external carriers: each vehicle keeps its own capacities, and the engine shares the work between them.

  • Materials and loading order

    Capacities change with the material, and the order in which materials are collected matters: a skip that has received mud can only receive mud afterwards.

  • Opening hours

    The availability and opening hours of construction sites and disposal sites alike are taken into account in the schedule.

  • Capacities

    The capacity of each truck and the intake capacity of each disposal site set what can be loaded and where it can be dropped.

The nearest disposal site is not always the cheapest

Each disposal site takes waste back at its own price per tonne. The engine compares the trip and the take-back price for each construction site, instead of always sending trucks to the closest one.

Choosing the disposal site for a construction site Diagram: one construction site linked to two disposal sites. The nearest has a higher price per tonne; the other is a little farther away and cheaper per tonne, which gives a lower total cost. 24 km Nearest disposal site Short trip, higher price per tonne Trip €48 + disposal €1,140 Total cost: €1,188 34 km Farther disposal site Longer trip, lower price per tonne Trip €68 + disposal €936 Total cost: €1,004 -15% Construction site 12 t
Values for construction site 1 of the illustrative example below.

With large tonnages, a longer trip can cost less overall. With small ones, the nearest disposal site remains the right choice: the engine does this calculation for you.

In a few clicks

Three steps, from file to schedule.

  1. Import your data

    Construction sites, fleet, disposal sites and rates: import them from your files.

  2. Run the calculation

    The engine assigns trucks, orders the collections and picks the disposal sites.

  3. Reduce your costs

    A dashboard shows the detail by truck and by site, with schedules, hours and maps.

Your current organization versus OCTAVE-ENGINE

Illustrative example.

An example with four construction sites shows the mechanism: the current organization sends every site to the nearest disposal site; the engine chooses the disposal site for each one.

Assumptions for the example: the nearest disposal site takes waste back at €95 per tonne, the farther one at €78 per tonne, and each kilometer costs €2. Total cost = tonnes × disposal price per tonne + kilometers × cost per kilometer.

Disposal site chosen for each construction site
Construction site Tonnes Your organization OCTAVE-ENGINE
Construction site 1 12 t Nearest Farther
Construction site 2 8 t Nearest Farther
Construction site 3 15 t Nearest Farther
Construction site 4 3 t Nearest Nearest
Comparison for the example
Indicator Your organization OCTAVE-ENGINE Difference
Tonnes collected 38 t 38 t 0 t
Kilometers driven 92 km 120 km +28 km
Disposal cost €3,610 €3,015 -€595
Kilometer cost €184 €240 +€56
Total cost €3,794 €3,255 -€539 (-14%)

Kilometers and total cost

  • Your organization
  • OCTAVE-ENGINE
Chart: kilometers and total cost, current organization and OCTAVE-ENGINE Two groups of bars. OCTAVE-ENGINE drives more kilometers than the current organization, but its total cost is lower. Illustrative example. 92 km 120 km Kilometers driven €3,794 €3,255 Total cost
Illustrative example.

The engine drives more kilometers, but the disposal site that is cheaper per tonne lowers the total cost. For the construction site with the smallest tonnage, it keeps the nearest disposal site.

A dashboard to read the result

After the calculation, everything is read in one place: the detail by truck and by site, schedules and hours, and maps.

Illustrative diagrams of the dashboard.

  • Diagram: detail by truck Three trucks, each with a series of stops and a load bar. Truck 1 Truck 2 Truck 3

    By truck

    The load and stops of each truck, in-house or external.

  • Diagram: detail by site A table of sites showing, for each, the chosen disposal site and its hours. SiteDisposal siteHours

    By site

    The construction sites emptied and the disposal sites chosen, with the opening hours of each.

  • Diagram: truck schedule Three truck rows across a day, with collection blocks in the morning and the afternoon. Morning Afternoon Truck 1 Truck 2 Truck 3

    Schedules and hours

    The schedule of each truck over the day, with arrival times at the sites.

  • Diagram: route map A map with construction sites, two disposal sites and the trips linking them. Site Disposal site Trip

    Maps

    The routes on a map: construction sites, disposal sites and trips.

Connect to your tools

Two ways to bring OCTAVE-ENGINE into your operations.

File import

Load your construction sites, fleet, disposal sites and rates from a file.

API

The API connects OCTAVE-ENGINE to your business software and gives it access to the optimization engine.

Explore the API →

See the engine on your construction sites

Describe your fleet and your disposal sites: we will set up a demo for you.

0 / 5000 characters

Delivery file (optional)

Accepted formats: .xlsx .xls .csv .ods .txt .md — 5 MB max, one file only.