Compare construction waste disposal costs across sites

Haulage, waiting time, gate fee and French waste tax: compare the full cost of one removal to two or three disposal sites in France, from your tonnage and your own costs.

Compare two or three disposal sites

Nothing is pre-filled: enter your own prices, distances and costs.

Construction site

From your weighbridge tickets; one decimal at most.

With a tonnage entered directly, truckloads are counted by weight only; the volume of the body or skip is not assessed.

Truck

Maximum authorised gross weight: 32 t (French Highway Code, code de la route, art. R312-4, I, 3°, read on 02/11/2026).

You know

What the truck can carry. The maximum authorised gross weight includes the weight of the truck itself.

Truck costs

Your own cost per kilometre, fuel and wear included.

Driver and idle truck, applied to the waiting time.

For cost benchmarks, the French road haulage committee (Comité national routier) publishes indices and studies: CNR website

The year of the removal. Amounts for coming years are set by law and can be changed by a Finance Act.

Disposal sites

Fill in at least two disposal sites; the third one is optional.

Disposal site 1

To identify it in the result; it is neither stored nor sent.

From the construction site to the facility and back, in whole kilometres.

Price per tonne from your quote or invoices.

Does this price include the French waste tax?

This applies to taxed facilities: non-hazardous waste landfill or incineration.

Time at the disposal site: queuing, weighing, unloading; 0 if none.

Disposal site 2

To identify it in the result; it is neither stored nor sent.

From the construction site to the facility and back, in whole kilometres.

Price per tonne from your quote or invoices.

Does this price include the French waste tax?

This applies to taxed facilities: non-hazardous waste landfill or incineration.

Time at the disposal site: queuing, weighing, unloading; 0 if none.

Disposal site 3 (optional)

To identify it in the result; it is neither stored nor sent.

From the construction site to the facility and back, in whole kilometres.

Price per tonne from your quote or invoices.

Does this price include the French waste tax?

This applies to taxed facilities: non-hazardous waste landfill or incineration.

Time at the disposal site: queuing, weighing, unloading; 0 if none.

Calculation method

The same calculation is made for each disposal site, with your values and the waste tax rates for the chosen year.

  • Truckloads: with a tonnage entered directly, the tonnage divided by the payload, rounded up; a partial load counts as a full one. The volume of the body or skip is not assessed.
  • Haulage: truckloads × round-trip distance × cost per kilometre.
  • Waiting time: truckloads × waiting time per trip × hourly cost.
  • Facility gate fee: actual tonnes × price per tonne; the last load, if partial, only pays for what it carries.
  • French waste tax: actual tonnes × rate for the chosen year, if the facility is taxed and its price excludes the tax. If the price already includes it, its share is shown for information and not added.
  • Total: haulage + waiting time + gate fee + tax; cost per tonne: total divided by the tonnes.
  • The cheapest is the disposal site with the lowest total; the result says so when there is a tie.

Each calculated quantity is rounded once, to the nearest value (a half is rounded up); truckloads are rounded up: a partial load counts as a full one.

Maximum truck weights

French Highway Code limits used to check the payload; your truck's authorised gross weight may be lower.

TruckMaximum authorised gross weightArticle
8×4 rigid tipper (four axles) 32 t art. R312-4, I, 3°, read on 02/11/2026
Hooklift, three-axle rigid 26 t art. R312-4, I, 2°, read on 02/11/2026
Hooklift, four-axle rigid 32 t art. R312-4, I, 3°, read on 02/11/2026
Articulated tipper (five axles or more) 40 tJourney entirely within France: 44 t art. R312-4, II, 2°, read on 02/11/2026
art. R312-4, III, read on 02/11/2026

What the calculation leaves out

These items are not included; add them to your estimate if they apply to you.

  • The volume of the body or skip: with a tonnage entered directly, only weight determines the number of truckloads; light waste can fill the body before the payload is reached.
  • The reduced rate for high-performance sorting residues (CIBS, the French code of taxes on goods and services, art. L. 433-89 and L. 433-90): its conditions cannot be checked here; the tax rates page shows it.
  • Weight tolerances of the French Highway Code (art. R312-4, IV): up to 1 t for alternative propulsion, 2 t for a zero-emission vehicle in the configurations provided for, 0.5 t for a retarder, 1 t for the sixth axle of a combination. They are not added to the limits.
  • The implementing rules set by order of the minister for transport (art. R312-4, VI): check that your combination meets them.
  • Facilities exempt from the tax, which are not offered: a facility used exclusively to store the waste that the person operating it produces (CIBS, art. L. 433-48), one used exclusively to incinerate the waste that the person operating it produces (art. L. 433-77) and, for non-hazardous waste, a classified facility permitted for co-incineration (art. L. 433-78). Do not choose "ISDND" or "Incineration" for these sites: the tax would be added wrongly.
  • Intermodal container transport (art. R312-4, II, 3° and 4°), two-axle rigids and hooklifts with a trailer: these profiles are not offered.
  • VAT.
  • Road tolls.
  • A load being refused or downgraded by the facility.
  • Skip or container hire.
  • The facility's own fees, outside the price per tonne.
  • Surcharges on the waste tax (irregular operation, municipal surcharge).
  • Facilities in Corsica and the French overseas territories, where special waste tax rules apply: the tools cover mainland France only.
  • Hazardous waste and asbestos, which follow their own rules (waste tracking form, Trackdéchets).

Indicative result: it replaces neither the facility's quote nor tax advice.

Frequently asked questions

Why is the nearest disposal site not always the cheapest?

The trip is only part of the cost. The price per tonne and the waste tax apply to every tonne: with a large tonnage, a site further away but cheaper per tonne can cost less in total.

How do I know whether the facility's price includes the waste tax?

Check your quote or invoice, or ask the facility. The tax is owed by the facility that receives the waste (CIBS, the French tax code, art. L. 433-65), which must pass it on in its contracts (code de l'environnement, the French Environmental Code, art. L. 541-30-2). If it is shown separately on the quote, answer "tax excluded".

Why does an inert waste landfill (ISDI) have no tax?

Inert waste is exempt from the "taxe sur les déchets mis en décharge" (landfill tax; CIBS, art. L. 433-50, 1°). A recycling or sorting platform is not taxed either: it is not a classified facility permitted for the landfilling or the thermal treatment of waste (CIBS, art. L. 433-45 and L. 433-74).

Which tax rate year should I choose?

The year of the removal. Amounts for coming years are written in the law, but a Finance Act can change them: the tax rates page shows the status of each year.

How do I know my tonnage?

The facility's weighbridge tickets give the actual weight of each load. For an upcoming construction site, start from the tickets of a similar one.

Which costs per kilometre and per hour should I enter?

Your own: they depend on the truck, its age and your organisation. The comparator does not suggest any value. The French road haulage committee (Comité national routier) publishes indices and studies to benchmark them.

Are my values stored?

No. The calculation runs in your browser; nothing is stored or sent. Audience analytics count comparisons along with the truck type, the number of disposal sites, their facility types, the tax rate year, the language of the page and whether the nearest disposal site is also the cheapest, never tonnages, distances, prices or names.

Sources

Official texts read in full, with the date they were read.